Design,build,finish.
One company for drawings, structure, building services and finishes. One contact, one schedule, a quote per trade.

Design and drawings
Before any work starts we produce the file that lets the job be built without improvising: surveys, layout plans, 3D renders, construction drawings and building services drawings.
- Site surveys and photographed condition reports
- Interior architecture plans, elevations and detail books
- Room-by-room 3D renders
- Building services drawings: HVAC, plumbing, electrical, single-line diagram
Construction and exteriors
Masonry, remedial works and extensions, façades and cladding. We coordinate the trades and hold the schedule trade by trade.
- Structural work, masonry, remedial work
- Façades, render and stone cladding
- Terraces, waterproofing, green roofs
- Taking over stalled sites
Building services
Air conditioning, plumbing and electrical installed in the right order: ductwork first, then drainage, pressurised pipework and finally the wiring.
- Ducted and wall-mounted air conditioning, ventilation
- Plumbing, wall-hung sanitaryware, drainage
- Power, lighting, low-voltage, generator and changeover
- CCTV and home automation
Fit-out and finishes
Ceilings, partitions, floor and wall finishes, bespoke joinery and integrated lighting. No timber floors in Conakry: we lay wood-effect porcelain, which copes with the humidity.
- Plasterboard and PVC ceilings, lighting coves
- Wall panelling, timber louvres, marble
- Tiles, porcelain, stone
- Made-to-measure furniture, counters and dressing rooms
Every wall, dimensioned.
More than 150 design sheets for a single villa: plans, elevations and renders room by room.
Crews install what is drawn. When everything is dimensioned on paper, there are no questions left on site, and no rework.

We source the finishes.
In Conakry, a tap with no spare parts is a lost tap.
- Standard finishes through Dubai, ceramics from Turkey
- Glazing from Casablanca, Dakar or Abidjan
- Designer pieces ordered straight from the brand
- Delivery to site with our own vans, flatbed and dump truck

Nothing is closed in untested.
Every hold point gets a signed test record. That is what stops new tiles being broken up six months later.
the working pressure, held for two hours, on every water line before it is closed in.
of nitrogen testing at about 40 bar, then a triple vacuum on the air conditioning.
of flood testing in wet rooms, before any tiles go down.
of drains filled and checked, condensate lines included, before ceilings close.
Megger test on every electrical circuit before it is switched on.
Photos with a tape in shot of everything about to vanish behind a wall or ceiling.
Drawings to price?
Send your drawings, even incomplete ones, or describe the project. We come back within 48 hours to arrange a site visit.
Request a quote